home OSTAP system portfolio press contact us





The completion period is reduced by 30% in comparison to conventional construction method. We have completed a two-storey detached house in Petaling Jaya (for a lawyer, Mr. Lee) with a built-up area of 4,600 sq ft. It required only 6 workers in 3 weeks to demolish an existing house, complete the foundations, construct paneling, floor stab and to fit in partitions. It only took 3 months to complete the entire house including internal finishing.




Testimonial from house owner Mr. Lee

My double-storey detached house was completed within 3 months of commencement of construction. The use of the pre-cast panels known as O-stable panel system resulted in substantial savings, both in terms of time and also cost of construction. It is likely that had conventional methods of construction been used, the cost of construction would have increased by as much as 30%.

The finishing is excellent. The walls are smooth and the lines clean.

However, the most impressive feature of the construction is the ventilation system. The air-conditioners in the house are used sparingly. Even on a hot day, the inside of the house is relatively comfortable.


Testimonial from Norizamshah Zainal, Kumpulan Lebar Daun CEO

We choose this system because we want customers to be satisfied with the quality of houses. We wish to have a constant quality all throughout from number 1 to number 4000.

I think you've got to look at the future outlook of the construction business itself. With less dependent of foreign workers, I think a lot more developers might have to adopt this technique somehow rather.


0-Stable System Panel Sdn Bhd © 2003 All Rights Reserved.
Warning Notice